Lead-based paint was banned for residential use in the United States in 1978. Anything built before that may contain it, and a meaningful share of the housing stock in the City of Roanoke predates that line. The city runs its own lead hazard reduction programs precisely because of this.

There is a federal rule that governs how contractors handle it, and most homeowners have never heard of it. It is worth ten minutes of your attention, because compliance is not optional for the contractor and non-compliance creates a genuine hazard in your house.

What the RRP rule is

The EPA's Renovation, Repair and Painting Rule applies to work in housing, apartments and child-occupied facilities built before 1978. Its core requirement is straightforward: anyone paid to perform work that disturbs paint in those buildings must be certified by the EPA. That includes every firm, down to sole proprietorships.

Certified firms must use lead-safe work practices and must provide homeowners with pre-renovation education materials before work begins.

One point that surprises people: paint testing is not required by the rule. But unless the contractor has documentation showing the paint is not lead-based, the requirements apply by default. Absence of a test does not create an exemption. It creates an obligation.

What counts as disturbing paint

The rule exempts genuinely minor work. Activities that disturb six square feet or less of paint per room on the interior, or twenty square feet or less on the exterior, fall under the minor repair and maintenance exemption.

Six square feet is a small area. It is roughly a two-foot by three-foot patch. Any meaningful scraping, sanding or surface preparation on a room's walls or trim exceeds it easily, which means most real repaint work in a pre-1978 home is covered.

Two activities are always covered regardless of size: window replacement and demolition. There is no square footage threshold for either.

What lead-safe work practices actually look like

The visible difference on a job site is containment. On interior work you should expect plastic sheeting sealed over floors and doorways, HVAC vents closed and covered so dust is not distributed through the house, and a defined work area that stays sealed while work is active.

You should not see dry scraping or open-flame burning of painted surfaces, and you should not see power sanding without HEPA attachment. Those methods generate exactly the fine dust the rule exists to control.

Cleanup uses HEPA vacuums and wet methods rather than sweeping, and on exterior work the ground below the work area is covered and the debris collected rather than left to wash into the soil around the foundation.

If you watch a crew dry-scrape the exterior of a 1950s Roanoke house onto the lawn, you are watching lead-contaminated dust and chips being distributed into the soil your family walks on. That is the specific outcome the rule is designed to prevent.

Why this matters more with children in the house

The health risk from lead is concentrated in young children and in pregnant women, and the exposure route in renovation is dust rather than intact paint. Intact lead paint on a wall is generally not the hazard. Lead paint that has been sanded, scraped or disturbed and become airborne dust is.

This is why the square footage thresholds are so low and why the containment requirements are so specific. The rule is not concerned with paint sitting on a wall. It is concerned with what happens to it during two days of preparation work.

The Virginia Department of Health and the City of Roanoke both operate lead poisoning prevention programs, and the city has run lead hazard reduction efforts targeting its older housing specifically. If your home predates 1978 and you have young children, those programs are worth looking into independent of any painting project.

The question to ask before hiring

Ask whether the firm is an EPA Lead-Safe Certified Firm, and ask to see the certification. A firm operating legally in pre-1978 housing has it and will produce it.

Then ask what containment they plan to use in your specific rooms. A contractor who is genuinely working within the rule can describe what will be sealed, how the HVAC will be handled, and how cleanup will be verified. One who is not will give you a general reassurance.

You should also expect to receive the EPA's pre-renovation education pamphlet before work begins, and to sign an acknowledgment that you received it. If a contractor working on a pre-1978 home never gives you that document, they are not following the rule.

What this means practically

Working within the RRP rule takes more time and costs more than working outside it. Containment setup, HEPA equipment, and controlled cleanup add hours to a job that would otherwise move faster.

That cost differential is a real part of why bids on older homes vary, and it is worth understanding when you are comparing estimates. A contractor who has priced proper containment on your 1948 house is going to come in higher than one who has priced dry scraping it. The lower number is not a better deal. It is a different job with a different set of consequences that land in your house rather than on the contractor's.

You can confirm current requirements and look up certified firms directly through the EPA's Renovation, Repair and Painting Program pages at epa.gov.

Frequently Asked Questions

Does my painter need to be lead certified?

If your home was built before 1978 and the work disturbs more than six square feet of paint in a room interior or twenty square feet on the exterior, the firm must be certified by the EPA under the Renovation, Repair and Painting Rule. This applies to all firms including sole proprietorships.

What is the EPA RRP rule?

A federal rule requiring firms paid to disturb paint in pre-1978 housing and child-occupied facilities to be EPA certified, to use lead-safe work practices, and to provide homeowners with pre-renovation education materials before work begins.

Does my house need a lead paint test before painting?

Testing is not required by the RRP rule. However, unless the contractor has documentation that the paint is not lead-based, the rule applies by default. The absence of a test does not exempt the work.

What should lead-safe painting work look like?

Plastic containment sealed over floors and doorways, HVAC vents closed and covered, no dry scraping or open-flame burning, no power sanding without HEPA attachment, HEPA vacuum and wet cleanup, and ground covering with debris collection on exterior work.

How much of Roanoke housing was built before 1978?

A substantial share of the City of Roanoke's housing stock predates 1978, which is why the city operates lead hazard reduction programs targeting older homes. If your home was built before that year, assume the rule applies unless documented otherwise.

If your home predates 1978, ask us about containment at the walkthrough. Star City Painters would rather explain the extra day of setup up front than have you wonder later why one bid was cheaper.

Call (540) 613-1953 or request a free estimate.